Knowledge

Featured - Case

  • Hospitals

    Banner Health Thunderbird campus

    Banner Ironwood Medical Center has three 350 ton York water-cooled YK chillers with variable frequency drives (VFD).

  • Retail

    Energy Optimisation of Supermarkets in Italy

    ClimaCheck’s monitoring systems are installed in more than 100 supermarkets offering continuous energy monitoring.

  • Hospitals

    Banner Health Ironwood Medical Center

    Banner Ironwood Medical Center has three 350 ton York water-cooled YK chillers with variable frequency drives (VFD).

  • Ships

    Superyacht Seven Seas

    ClimaCheck is used on a superyacht where the chillers consumed a total of 863 526 kWh/year, before optimisation.

  • Buildings

    Akademiska Hus, new heating and cooling system at KTH

    Akademiska Hus invested in a new cooling and heat pump system at KTH campus. To reduce its costs for heating and cooling, ClimaCheck was installed as part of the project.

Let us guide you to a more sustainable and optimised HVACR system!